On-site installation of 300 t/h iron ore processing system is in progress

The 300 t/h iron ore processing system designed and manufactured by Artelleck has started the installation process after arriving at the customer’s site. The customer is very satisfied with the production efficiency of Ateric, the products arrive on time to the customer site, and the customer’s production plan is progressing steadily.

Ateriac insists on providing customers with a complete set of crushing equipment solutions with first-class quality and perfect service system, and will live up to the trust of every customer!